Ferreira Construction is responsible for the staged demolition and replacement of bridge decks at four structures, demolition and full superstructure replacement at three additional structures, and the repair of structural steel at an eighth structure. Replacement decks at Structures 144.7 and 149.4 will be constructed using cast-in-place high early strength high performance concrete. Structures 143.2 and 151.1 will be re-decked with precast concrete panels with polymer grout connections.